Sheet 001 — Owner's Representative

001/006

The project is decided before the first flame.

We secure the technical chain of your thermal projects, from scope definition to SAT acceptance.

Scope a project
Industrial monobloc burner, three-quarter view
Fig. 01 — monobloc burner, 3/4 view  ·  01 combustion head  ·  02 gas train

DesignAutoCAD · SolidWorks · EPLAN · P&ID

ProcurementTBE · RFQ · Owner's Rep

AcceptanceCOT · SAT · FAT

002/006 — Positioning

Neither supplier nor general engineering firm.
We represent the owner.

Scope
PSD · CAPEX/OPEX
Bids
RFQ · TBE
Execution
As-built · I/O
Acceptance
COT · SAT · FAT

003/006 — Expertise

01

Strategic project management

Roadmap, financial guardrails, critical-path schedule, weekly risk tracking.

MS Project · PSD · CAPEX/OPEX

02

Advanced engineering & documentation

Mechanical, electrical, I&C: RFQ packages, functional descriptions, I/O lists, 3D models.

AutoCAD · SolidWorks · EPLAN · P&ID

03

Implementation & procurement

Tendering, supplier pre-qualification, technical bid evaluation, as-built verification.

TBE · RFQ · Owner's Rep

04

Commissioning & start-up

COT handover, cold and hot commissioning, SAT, final transfer, operator training.

COT · SAT · FAT

004/006 — Industries

Steel · Cement · Glass

005/006 — Project path

  1. 01ScopingPSD
  2. 02DesignP&ID
  3. 03TenderingRFQ
  4. 04EvaluationTBE
  5. 05ExecutionAs-built
  6. 06HandoverCOT
  7. 07AcceptanceSAT

[ Proof placement — references to be completed ]